GSTDTAP  > 资源环境科学
Upgrading Aotea/Great Barrier tracks to prevent kauri dieback spread
admin
2019-09-20
发布年2019
语种英语
国家新西兰
领域资源环境
正文(英文)

Introduction

Ten tracks on Aotea / Great Barrier Island are being upgraded to prevent the spread of kauri dieback disease.

Date:  20 September 2019

The tracks will be closed at times to protect the public and contractors while the upgrade is done.

Aotea’s most popular tracks – Palmers Track to the Hirakimata Summit, the Windy Canyon walk and the Kaitoke Hot Springs tracks – will remain open at all times as these tracks have already been upgraded.    

The following tracks will be closed while they’re upgraded. The aim is to complete the work and reopen these tracks by the start of summer:

  • Line W Track
  • Maungapiko Lookout Track
  • Old Lady Walk
  • Mill Track
  • Tramline Track, Whangaparapara
  • Warrens Track/Bridle Tracks
  • Whangaraparapa Campsite Track, and
  • Withey’s Track. 

Upgrading the South Fork and Kiwiriki tracks will take longer. The aim is to complete this work and re-open the tracks by mid-summer.

DOC's Acting Aotea Great Barrier Islands Operations Manager Dave Smith says upgrading these tracks is essential to prevent kauri dieback spreading.  

“Kauri dieback is caused by microscopic spores that thrive in wet and muddy conditions and can be spread on footwear by people walking on tracks in kauri forest.

“The upgrade will remove wet and muddy parts of these tracks by installing sections of boardwalk and spreading a bark-gravel mix to provide a walking surface that will stay mud-free.

“Box step stairways will be installed on steep sections of tracks and barriers will be installed to protect kauri in forest bordering the tracks.

“As well as protecting kauri, the upgrades will make walking these tracks easier and more enjoyable for people of all ages.”      

The public has a vital role to play in protecting kauri from kauri dieback.

“When the tracks are reopened, people need to stay on the tracks. We also need them to use hygiene stations, at track entrances, to clean their footwear when they enter and leave the tracks,” says Dave Smith.

Closure and opening dates, for the 10 tracks, will be posted on the DOC website during the upgrade period.

The tracks are in the Aotea Conservation Park, which covers more than 12,000 hectares, 43%, of Aotea / Great Barrier Island.

The park is run by DOC, assisted by the Aotea Conservation Park Advisory Committee, which has 10 representatives from iwi and the community on Aotea.

Contact

For media enquiries contact:

Phone: +64 4 496 1911
Email: media@doc.govt.nz

URL查看原文
来源平台Department of Conservation
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/217001
专题资源环境科学
推荐引用方式
GB/T 7714
admin. Upgrading Aotea/Great Barrier tracks to prevent kauri dieback spread. 2019.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。