GSTDTAP

浏览/检索结果: 共71条,第1-10条 帮助

限定条件    
已选(0)清除 条数/页:   排序方式:
Collaborative Research: DASI Track 1: Development of a Distributed Multiple-Input Multiple-Output (MIMO) Meteor Radar Network for Space Weather Research 项目
项目编号:1933007; 经费:333691(USD); 起止日期:2020 / dc_date_end
项目负责人:  Scott Palo (Principal Investigator)
收藏  |  浏览/下载:5/0  |  提交时间:2019/11/27
Collaborative Research: DASI Track 1: Development of a Distributed Multiple-Input Multiple-Output (MIMO) Meteor Radar Network for Space Weather Research 项目
项目编号:1933005; 经费:169201(USD); 起止日期:2020 / dc_date_end
项目负责人:  Ryan Volz (Principal Investigator)
收藏  |  浏览/下载:24/0  |  提交时间:2019/11/27
Supporting Marine Geoscience Research with ongoing Growth of the Global Multi-Resolution Topography Synthesis and Maintenance of GeoMapApp 项目
项目编号:1929655; 经费:291648(USD); 起止日期:2019 / dc_date_end
项目负责人:  Suzanne Carbotte (Principal Investigator)
收藏  |  浏览/下载:11/0  |  提交时间:2019/11/27
Processing, interpretation and analysis of the NZ3D seismic data to investigate fault property controls on slow-slip along the Hikurangi megathrust 项目
项目编号:1901645; 经费:1146684(USD); 起止日期:2019 / dc_date_end
项目负责人:  Nathan Bangs (Principal Investigator)
收藏  |  浏览/下载:14/0  |  提交时间:2019/11/27
Through the Ocean to the Mantle: Seismic Study of the Pacific Mantle with Long-Lived Autonomous Floating Seismic Sensors 项目
项目编号:1917058; 经费:394406(USD); 起止日期:2019 / dc_date_end
项目负责人:  Frederik Simons (Principal Investigator)
收藏  |  浏览/下载:2/0  |  提交时间:2019/11/27
Collaborative Research: CEDAR: Why is the High-Latitude Ionosphere More Variable in January than in July? 项目
项目编号:1924736; 经费:89576(USD); 起止日期:2019 / dc_date_end
项目负责人:  Seebany Datta-Barua (Principal Investigator)
收藏  |  浏览/下载:1/0  |  提交时间:2019/11/27
Collaborative Research: CEDAR: Why is the High-Latitude Ionosphere More Variable in January than in July? 项目
项目编号:1922930; 经费:192100(USD); 起止日期:2019 / dc_date_end
项目负责人:  Alex Chartier (Principal Investigator)
收藏  |  浏览/下载:2/0  |  提交时间:2019/11/27
Global P, SV, and converted wave measurements for improved lower mantle P and S structure studies 项目
项目编号:1853911; 经费:275045(USD); 起止日期:2019 / dc_date_end
项目负责人:  Edward Garnero (Principal Investigator)
收藏  |  浏览/下载:4/0  |  提交时间:2019/11/27
Collaborative Research: RAPID--Forensic Analysis of Flood-Wind-Rainfall Interactions during Hurricanes Florence and Michael 项目
项目编号:1909367; 经费:30611(USD); 起止日期:2019 / dc_date_end
项目负责人:  Yu Zhang (Principal Investigator)
收藏  |  浏览/下载:4/0  |  提交时间:2019/11/27
Collaborative Research: RAPID--Forensic Analysis of Flood-Wind-Rainfall Interactions during Hurricanes Florence and Michael 项目
项目编号:1908862; 经费:89525(USD); 起止日期:2019 / dc_date_end
项目负责人:  Lixin Lu (Principal Investigator)
收藏  |  浏览/下载:7/0  |  提交时间:2019/11/27