GSTDTAP

浏览/检索结果: 共7条,第1-7条 帮助

已选(0)清除 条数/页:   排序方式:
DOE公布电网管理和风险评估系统研究资助计划 快报文章
地球科学快报,2020年第9期
作者:  王立伟
Microsoft Word(15Kb)  |  收藏  |  浏览/下载:380/0  |  提交时间:2020/05/09
power grid management  risk assessment  project funding  
Global projections of drought hazard in a warming climate: a prime for disaster risk management 期刊论文
CLIMATE DYNAMICS, 2018, 50: 2137-2155
作者:  Carrao, Hugo;  Naumann, Gustavo;  Barbosa, Paulo
收藏  |  浏览/下载:6/0  |  提交时间:2019/04/09
Drought hazard  Risk management  Global warming  CMIP5 models  ISI-MIP project  RCP scenarios  
Project Management Guidelines and Handbook: Part I ? Project Management Guidelines, Part II ? Project Management Handbook 科技报告
来源:World Meteorological Organization (WMO). 出版年: 2016
作者:  World Meteorological Organization
收藏  |  浏览/下载:3/0  |  提交时间:2019/04/05
World Meteorological Organization (WMO)  Guidelines  Project management  
Project Management Guidelines and Handbook 科技报告
来源:World Meteorological Organization (WMO). 出版年: 2016
作者:  World Meteorological Organization
收藏  |  浏览/下载:0/0  |  提交时间:2019/04/05
World Meteorological Organization (WMO)  Guidelines  Project management  
West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013 科技报告
来源:US Department of Energy (DOE). 出版年: 2014
作者:  Rendall, John D.;  Steiner, Alison F.;  Pendl, Michael P.
收藏  |  浏览/下载:6/0  |  提交时间:2019/04/05
West Valley Demonstration Project  WVDP  Annual Site Environmental Report  ASER  Calendar Year 2013  CH2M HILL • B&W West Valley  LLC  DE-EM0001529  Public Health and Safety and the Environment Are Protected  Airborne and Waterborne Releases to the MEOSI  Climate Change  DOE/NYSERDA Consent Decree  Dose Assessment  Dose to Biota  Drinking Water  Environmental Characterization Support Services  Environmental Compliance  Environmental Management System: EMS  Environmental Monitoring  Groundwater Protection Program  High-Level Waste (HLW) Canister Interim Storage System  HLW canister storage pad  National Emissions Standards for Hazardous Air Pollutants  NESHAP  National Environmental Policy Act  NEPA  North Plateau Full-Scale Permeable Treatment Wall  PTW  Nuclear Regulatory Commission (NRC)-Licensed Disposal Area  NDA  Performance Indicators  Phase 1 Decommissioning and Facility Disposition Contract  Phase 1 Studies  Quality Assurance  Record of Decision  ROD  Resource Conservation and Recovery Act  RCRA  Safety Success  Site Sustainability Plan  SSP  State Pollutant Discharge Elimination System (SPDES) Permit Noncompliance  SPDES  Tank and Vault Drying System  T&VDS  Vertical Storage Casks  VSC  Waste Minimization and Pollution Prevention  Waste Tank Farm  WTF  Waste-Incidental-to-Reprocessing  WIR  
Screening Assessment of Potential Human-Health Risk from Future Natural-Gas Drilling Near Project Rulison in Western Colorado 科技报告
来源:US Department of Energy (DOE). 出版年: 2012
作者:  Daniels Jeffrey I.,Chapman Jenny B.
收藏  |  浏览/下载:7/0  |  提交时间:2019/04/05
The Project Rulison underground nuclear test was conducted in 1969 at a depth of 8  400 ft in the Williams Fork Formation of the Piceance Basin  west-central Colorado (Figure 1). The U.S. Department of Energy Office of Legacy Management (LM) is the steward  
Post evaluation of a capacity building project in the Southern synods of Ethiopia 科技报告
来源:Center for International Climate and Environmental Research-Oslo (CICERO). 出版年: 2010
作者:  Kristensen, Kåre
收藏  |  浏览/下载:0/0  |  提交时间:2019/04/05
East Africa  Ethiopia  Ethiopian Evangelical Church Mekane Yesus  development aid  project management  VDP::Social science: 200::Sociology: 220