已选(0)清除
条数/页: 排序方式: |
| Onde estamos na implementação do Código Florestal? 科技报告 来源:Climate Policy Initiative. 出版年: 2019 作者: Joana Chiavari and Cristina Lopes Adobe PDF(4893Kb)  |  收藏  |  浏览/下载:47/36  |  提交时间:2020/04/16 climate policy forest code land use monitoring monitoring and evaluation policy analysis policymakers |
| Brazil knows what to do to fight deforestation in the Amazon 科技报告 来源:Climate Policy Initiative. 出版年: 2019 作者: Juliano Assuncao and Clarissa Gandour 收藏  |  浏览/下载:12/0  |  提交时间:2020/04/16 Amazon deforestation monitoring monitoring and evaluation satellite monitoring |
| Indicators to measure the climate change adaptation outcomes of ecosystem-based adaptation 期刊论文 CLIMATIC CHANGE, 2019 作者: Donatti, Camila I.; Harvey, Celia A.; Hole, David; Panfil, Steven N.; Schurman, Hanna 收藏  |  浏览/下载:9/0  |  提交时间:2020/02/17 Climate change adaptation outcomes Ecosystem-based adaptation EbA effectiveness Monitoring and evaluation |
| A review of close-range and screening technologies for mitigating fugitive methane emissions in upstream oil and gas 期刊论文 ENVIRONMENTAL RESEARCH LETTERS, 2019, 14 (5) 作者: Fox, Thomas A.; Barchyn, Thomas E.; Risk, David; Ravikumar, Arvind P.; Hugenholtz, Chris H. 收藏  |  浏览/下载:6/0  |  提交时间:2019/11/26 natural gas leaks leak detection and repair fugitive emissions management methane emissions monitoring technology evaluation |
| Indonesia’s Village Fund: An Important Lever for Better Land Use and Economic Growth at the Local Level 科技报告 来源:Climate Policy Initiative. 出版年: 2018 作者: Guntur Sutiyono; Saeful Muluk; Tiza Mafira and Randy Rakhmadi 收藏  |  浏览/下载:49/0  |  提交时间:2020/04/16 climate finance climate policy climate resilience deforestation developing economies Indonesia monitoring and evaluation policy and public affairs public finance sustainability |
| Approaches to assess the additionality of climate investments: Findings from the evaluation of the Climate Public Private Partnership Programme (CP3) 科技报告 来源:Climate Policy Initiative. 出版年: 2018 作者: Donovan Escalante; Dario Abramskiehn; Karoline Hallmeyer and Jessica Brown Adobe PDF(603Kb)  |  收藏  |  浏览/下载:64/30  |  提交时间:2020/04/16 case studies climate finance climate investment developing economies development finance institutions monitoring and evaluation |
| Supporting the Momentum of Paris: A Systems Approach to Accelerating Climate Finance 科技报告 来源:Climate Policy Initiative. 出版年: 2018 作者: Padraig Oliver; Bella Tonkonogy; David Wang and Xueying Wang 收藏  |  浏览/下载:13/0  |  提交时间:2020/04/16 climate finance development finance institutions financial institutions innovative finance investors monitoring and evaluation Paris Agreement private finance public finance sustainable development goals |
| Monitoring and evaluation of Sustainable Energy Action Plan: Practice and perspective 期刊论文 ENERGY POLICY, 2017, 100: 43725 作者: Delponte, Ilaria; Pittaluga, Ilaria; Schenone, Corrado 收藏  |  浏览/下载:2/0  |  提交时间:2019/04/09 Sustainable energy planning Covenant of Mayors Monitoring and evaluation GHG emissions monitoring |
| A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada 科技报告 来源:US Department of Energy (DOE). 出版年: 2014 作者: Drollinger, Harold; Holz, Barbara A; Bullard, Thomas F; Goldenberg, Nancy G; Ashbaugh, Laurence J; Griffin, Wayne R 收藏  |  浏览/下载:8/0  |  提交时间:2019/04/05 This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962 Tiny Tot in 1965 and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013 totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface four buildings four structures and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance mining activities related to development of the tunnel complex site preparation for activities related to the tests and experiments and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex designated historic district 143 and site 26NY15177 is eligible to the National Register of Historic Places under Criteria A C and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places the Desert Research Institute recommends that the area defined for the U15 Complex historic district 143 and site 26NY15117 be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations. |