GSTDTAP

浏览/检索结果: 共6条,第1-6条 帮助

已选(0)清除 条数/页:   排序方式:
A Few Thoughts on the E-Tunnel Discharge at Rainier Mesa, Nevada National Security Site 科技报告
来源:US Department of Energy (DOE). 出版年: 2016
作者:  Tompson, A.
收藏  |  浏览/下载:0/0  |  提交时间:2019/04/05
Rainier Mesa/Shoshone Mountain CAU Technical Basis Agreement Document: Hydrologic Source Term 科技报告
来源:US Department of Energy (DOE). 出版年: 2012
作者:  Tompson, A;  Zavarin, M;  McNab, W;  Lu, C;  Shumaker, D;  Carle, S
收藏  |  浏览/下载:2/0  |  提交时间:2019/04/05
Evaluation of Cavity Collapse and Surface Crater Formation for Selected Lawrence Livermore National Laboratory Underground Nuclear Tests - 2011, Part 2 科技报告
来源:US Department of Energy (DOE). 出版年: 2012
作者:  Pawloski, G A
收藏  |  浏览/下载:0/0  |  提交时间:2019/04/05
A Historical Evaluation of the U12n Tunnel, Nevada National Security Site, Nye County, Nevada Part 1 科技报告
来源:US Department of Energy (DOE). 出版年: 2011
作者:  Drollinger, Harold [DRI];  Jones, Robert C [DRI];  Bullard, Thomas F [DRI];  Ashbaugh, Laurence J [DRI];  Griffin, Wayne R
收藏  |  浏览/下载:13/0  |  提交时间:2019/04/05
This report presents a historical evaluation of the U12n Tunnel on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy  National Nuclear Secur  
A Historical Evaluation of the U12n Tunnel, Nevada national Security Site, Nye County, Nevada Part 2 of 2 科技报告
来源:US Department of Energy (DOE). 出版年: 2011
作者:  Dunn, M;  Johnson, K;  Jensen, M
收藏  |  浏览/下载:2/0  |  提交时间:2019/04/05
This report presents a historical evaluation of the U12n Tunnel on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy  National Nuclear Secur  
Thoughts Regarding the Dimensions of Faults at Rainier and Aqueduct Mesas, Nye County, Nevada, Based on Surface and Underground Mapping 科技报告
来源:US Department of Energy (DOE). 出版年: 2011
作者:  Liang, Xin-Zhong
收藏  |  浏览/下载:3/0  |  提交时间:2019/04/05
fault  UGTA  Rainier Mesa