GSTDTAP  > 地球科学
DOI10.2172/1045120
报告编号PNNL-21267
来源IDOSTI ID: 1045120
Report for Batch Leach Analyses on Sediments at 100-HR-3 Operable Unit, Boreholes C7620, C7621, C7622, C7623, C7626, C7627, C7628, C7629, C7630, and C7866. Revision 1.
Lindberg, Michael J.
2012-04-25
出版年2012
语种英语
国家美国
领域地球科学
英文摘要This is a revision to a previously released report. This revision contains additional analytical results for the sample with HEIS number B2H4X7. Between November 4, 2010 and October 26, 2011 sediment samples were received from 100-HR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL. Samples were received with a chain of custody (COC) and were analyzed according to the sample identification numbers supplied by the client. All Samples were refrigerated upon receipt until prepared for analysis. All samples were received with custody seals intact unless noted in the Case Narrative. Holding time is defined as the time from sample preparation to the time of analyses. The prescribed holding times were met for all analytes unless noted in the Case Narrative. All reported analytical results meet the requirements of the CAW or client specified SOW unless noted in the case narrative. Due to the requirements of the statement of work and sampling events in the field, the 28 day and the 48 hr requirements cannot be met. The statement of work requires samples to be selected at the completion of the borehole. It is not always possible to complete a borehole and have the samples shipped to the laboratory within the hold time requirements. Duplicate RPD for Uranium 238 (38.9%) was above the acceptance limit (35) in 1E05003-DUP1 for ICPMS-Tc-U-WE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Duplicate RPD for Silver 107 (68.2%) was above the acceptance limit (35) in 2C06004-DUP1 for ICPMS-RCRA-AE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Matrix Spike Recovery for Chromium, Hexavalent (48.8%) was outside acceptance limits (75-125) in 1E23001-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported. Matrix Spike Recovery for Chromium, Hexavalent (50.2%) was outside acceptance limits (75-125) in 2B22010-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported.
URL查看原文
来源平台US Department of Energy (DOE)
引用统计
文献类型科技报告
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/5863
专题地球科学
推荐引用方式
GB/T 7714
Lindberg, Michael J.. Report for Batch Leach Analyses on Sediments at 100-HR-3 Operable Unit, Boreholes C7620, C7621, C7622, C7623, C7626, C7627, C7628, C7629, C7630, and C7866. Revision 1.,2012.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Lindberg, Michael J.]的文章
百度学术
百度学术中相似的文章
[Lindberg, Michael J.]的文章
必应学术
必应学术中相似的文章
[Lindberg, Michael J.]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。