Global S&T Development Trend Analysis Platform of Resources and Environment
DOI | 10.2172/1022153 |
报告编号 | LLNL-TR-475451 |
来源ID | OSTI ID: 1022153 |
LLNL's Diagram of Chronological Events and B695 Weekly Inspection Reports | |
LaFreniere, L. M. (Environmental Science Division) | |
2011-03-22 | |
出版年 | 2011 |
页数 | 7 |
语种 | 英语 |
国家 | 美国 |
领域 | 地球科学 |
英文摘要 | Activities leading to the incident were: (1) RCRA Class 2 Permit Modification granted on July 25, 2007 to install a walk-in fume hood in room 1025; (2) USQ-695-07-148 to do the work approved on 9/17; (3) ducting removed early October done by Facility Personnel under IWS 10331.09; (4) ducting swiped for 'free release' radioactivity only by team 1 personnel on 10/16; (5) all ducting and valves remained in building 695 room 1025 except for one piece delivered to building 391 (MMED shop); (6) material delivered by facility personnel to MMED shope B391 on about 10/19; (7) MMED personnel took a duct piece to B511 shop and removed the flange which went to salvage; (8) MMED personnel took the duct piece back to B391 shop and welded on a cap; (9) RHWM personnel picked up the welded duct from B391 around 10/26 and returned ti to B695 room 1025; and (10) the analysis report receive don 12/3 indicated that beryllium swipes take on 11/16, in B695 room 1025, and on ducting that did not leave the room where personnel worked, were above the release level for beryllium. |
URL | 查看原文 |
来源平台 | US Department of Energy (DOE) |
引用统计 | |
文献类型 | 科技报告 |
条目标识符 | http://119.78.100.173/C666/handle/2XK7JSWQ/5370 |
专题 | 地球科学 |
推荐引用方式 GB/T 7714 | LaFreniere, L. M. . LLNL's Diagram of Chronological Events and B695 Weekly Inspection Reports,2011. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论