GSTDTAP  > 资源环境科学
DOI10.17226/26644
Design and Construction of Deck Bulb Tee Girder Bridges with UHPC Connections
National Research Council
2022-07-06
出版年2022
国家美国
领域资源环境
英文摘要

The advantage of prestressed concrete deck bulb tee (DBT) girder bridges is the speed of construction, since no separate decking is required. However, the performance of the connection between girders has been a primary concern.

The TRB National Cooperative Highway Research Program's NCHRP Research Report 999: Design and Construction of Deck Bulb Tee Girder Bridges with UHPC Connections presents an evaluation of prestressed concrete DBT girder bridges with ultrahigh-performance concrete (UHPC) connections.

URL查看原文
来源平台National Academies Press
引用统计
文献类型科技报告
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/352879
专题资源环境科学
推荐引用方式
GB/T 7714
National Research Council. Design and Construction of Deck Bulb Tee Girder Bridges with UHPC Connections,2022.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[National Research Council]的文章
百度学术
百度学术中相似的文章
[National Research Council]的文章
必应学术
必应学术中相似的文章
[National Research Council]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。