Systematic Approach for Determining Construction Contract Time: A Guidebook
National Academies of Sciences, Engineering, and Medicine
2022-03-18
出版年2022
国家美国
领域资源环境
英文摘要

Contract time affects the cost of construction, traffic disruption and public inconvenience, the economic impact of projects to the surrounding areas, and schedule risks.

The TRB National Cooperative Highway Research Program's NCHRP Research Report 979: Systematic Approach for Determining Construction Contract Time: A Guidebook provides state departments of transportation guidance for producing consistently credible, reliable, and defensible contract time estimates.

Supplemental to the report is NCHRP Web-Only Document 298: Developing a Systematic Approach for Determining Construction Contract Time, a spreadsheet-based Toolkit, a Technical Memorandum, and a Presentation.

URL查看原文
来源平台National Academies Press
引用统计
文献类型科技报告
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/351284
专题资源环境科学
推荐引用方式
GB/T 7714
National Academies of Sciences, Engineering, and Medicine. Systematic Approach for Determining Construction Contract Time: A Guidebook,2022.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[National Academies of Sciences, Engineering, and Medicine]的文章
百度学术
百度学术中相似的文章
[National Academies of Sciences, Engineering, and Medicine]的文章
必应学术
必应学术中相似的文章
[National Academies of Sciences, Engineering, and Medicine]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。