Developing a Systematic Approach for Determining Construction Contract Time | |
National Academies of Sciences, Engineering, and Medicine | |
2022-03-18 | |
出版年 | 2022 |
国家 | 美国 |
领域 | 资源环境 |
英文摘要 | Excessive contract time is costly because it extends a construction crew’s exposure to traffic, prolongs the inconvenience to the public, and subjects motorists to less than desirable safety conditions for longer periods. The TRB National Cooperative Highway Research Program's NCHRP Web-Only Document 298: Developing a Systematic Approach for Determining Construction Contract Timeseeks to provide a systematic approach for determining construction contract time for a wide spectrum of highway projects. The document is supplemental to NCHRP Research Report 979:Systematic Approach for Determining Construction Contract Time: A Guidebook. |
URL | 查看原文 |
来源平台 | National Academies Press |
引用统计 | |
文献类型 | 科技报告 |
条目标识符 | http://119.78.100.173/C666/handle/2XK7JSWQ/351281 |
专题 | 资源环境科学 |
推荐引用方式 GB/T 7714 | National Academies of Sciences, Engineering, and Medicine. Developing a Systematic Approach for Determining Construction Contract Time,2022. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论