Global S&T Development Trend Analysis Platform of Resources and Environment
Burton-upon-Trent flood defence work completes £30 million investment | |
admin | |
2022-06-16 | |
发布年 | 2022 |
语种 | 英语 |
国家 | 英国 |
领域 | 资源环境 |
正文(英文) | Burton-upon-Trent flood defence work completes £30 million investmentThe Environment Agency has completed additional flood defence work in Burton-upon-Trent, Staffordshire, to alleviate issues around the A38 at Branston. The work, which started last summer in 2021, reduces flood risk to some 397 properties, including 18 affected by the flood of February 2020. The whole investment in Burton, including £2 million from the National Highways Designated Funds programme, has cost over £30 million, and reduces the risk of flooding to over 4,600 homes and 1,000 businesses. The A38 at Branston and adjacent properties have experienced flooding on several occasions since 2000. An investigation revealed that when the level of the River Trent was high, water got into Severn Trent Water’s foul sewerage system, highway drains and through low ground and eventually flooded properties and the highway. Through the construction of sheet piled walls, embankments and non-return valves, water will now be contained in Tatenhill Brook when the River Trent is high. Will Groves, Senior Flood Risk Adviser for the Environment Agency, said:
Ian Doust, National Highways Programme Development Manager, said:
Published 16 June 2022
|
URL | 查看原文 |
来源平台 | UK Environment Agency |
文献类型 | 新闻 |
条目标识符 | http://119.78.100.173/C666/handle/2XK7JSWQ/349748 |
专题 | 资源环境科学 |
推荐引用方式 GB/T 7714 | admin. Burton-upon-Trent flood defence work completes £30 million investment. 2022. |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
查看访问统计 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
[admin]的文章 |
百度学术 |
百度学术中相似的文章 |
[admin]的文章 |
必应学术 |
必应学术中相似的文章 |
[admin]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论