GSTDTAP  > 地球科学
Investors not impressed by Aurelius’ maiden resource estimate at Aureus East gold project
admin
2022-05-26
发布年2022
语种英语
国家国际
领域地球科学
正文(英文)
Aurelius Minerals has released an initial mineral resource estimate on its Aureus East gold project in Nova Scotia. (Courtesy: Aurelius Minerals).

Aurelius Minerals (TSXV: AUL, US-OTCQB: AURQF) has released an initial mineral resource estimate on its Aureus East gold project in Nova Scotia, sending its equity to a new 12-month low at 19c apiece.

The Toronto-based explorer outlined 985 million tonnes in the indicated category grading 5.14 grams per tonne gold for 162,700 oz. of contained metal. The company also released an inferred resource estimate of 4.185 million tonnes grading 2.88 grams per tonne for 387,600 oz. gold.

The resource estimate holds 78,000 oz. of pit-constrained gold and another 84,700 oz. of underground material. The inferred material comprises 147,200 oz. of pit constrained and 240,400 oz. of underground constrained resources.

Aurelius said it plans to build on the resource estimate by focusing on the subsequent phases of drilling on high-grade target zones to increase the resource estimate in the near term and plans to fold this work into an upcoming preliminary economic assessment.

On Thursday, Aurelius noted “tremendous” exploration potential remaining on the property, with several zones north and south of the deposit axis.

Investors not impressed by Aurelius' maiden Aureus East resource estimate
Aurelius believes there remains significant exploration potential at Aureus East. (Source: Aurelius Minerals).

The zones extend from the surface and are open at depth, with potential for surface extraction and near-surface resource growth, Aurelius said.

According to Aurelius, most of the drilling is less than 500 metres deep and constrained to the western portion of the deposit, leaving a good amount of the property unexplored.

CEO Mark Ashcroft hailed the maiden resource estimate as a “major milestone” for the company.

“We established this maiden resource estimate as a key milestone for the project, and we have delivered on that in 21 months,” Ashcroft said in a news release.

“We had exceptional success in validating the project’s potential, with our drill program intersecting significant intervals of gold at 100% of our drill holes. The result is a robust gold resource that unlocks tremendous value through the drill bit and demonstrates the potential for significant additional resource growth in the near term.”

Aurelius now has four distinct mineral resource estimates in Nova Scotia.

The group is also advancing two district-scale gold projects in the Abitibi Greenstone Belt in Ontario.

By press time, its Toronto-quoted equity was trading near its C19c per share 12-month low at C21c, which marked an intra-day loss of nearly 18%. The company has a market capitalization of about C$9.6 million ($7.5m).

URL查看原文
来源平台Minging.com
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/348607
专题地球科学
推荐引用方式
GB/T 7714
admin. Investors not impressed by Aurelius’ maiden resource estimate at Aureus East gold project. 2022.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。