GSTDTAP  > 资源环境科学
RFF Response to US Department of Energy Notice of Intent and Request for Information Regarding Establishment of a Civil Nuclear Credit Program
2022-03-08
出版年2022
国家美国
领域资源环境
英文摘要

The CNC proposal offers a preliminary implementation strategy for the program authorized in H.R. 3684. Below, we offer our thoughts on what the Nuclear Energy Office should consider when finalizing the details of implementation and designing the certification procedure and the auction structure. Overall, we believe it is important to consider the accuracy, predictability, and transparency of information in the nuclear power sector to determine the optimal policy design. In an ideal world, both the public and the nuclear generators would have accurate and predictable information about their future costs and revenues. In such a world, an auction system to determine the funds necessary to sustain nuclear power generation would be unnecessary: the Department of Energy would simply determine which generators needed the least subsidy per MWh to stay operational and offer them those subsidies.

The auction described in the CNC proposal is a tool best leveraged in situations where information is imperfect due to a lack of transparency. In other words, nuclear generators have accurate and predictable information about their costs, but the public and government do not. The auction, if properly designed, is an opportunity to force generators to ‘reveal’ something approximating their true expected subsidy need by allowing them to compete with other generators for resources.

The auction, even if well-designed, does not fully resolve inefficiencies due to inaccurate or unpredictable information. If generators don’t have a good understanding of their likely costs and revenues in the future due to energy price uncertainty or other factors, their competitive bids may yield inefficient or inflated results reflecting a risk premium to address uncertainties. Perhaps a generator mistakenly bid $15/MWh when they really needed $25/MWh, and they received credits over a plant that bid $17/MWh. The former generator would be unprofitable, and the latter generator, if not subject to cost variability, would have been the more cost-efficient investment, but due to inaccurate information an ex post inefficient outcome would be reached. Concrete and transparent assumptions set out in the certification process, and an index adjustment mechanism for credit values, will be important tools for dealing with inaccurate or uncertain information.

We believe DOE is best positioned to determine the information gaps that exist in this sector, but you will see these ideas referenced repeatedly below because the quality of information affects the policy pathways we would recommend.

URL查看原文
来源平台Resources for the Future
文献类型科技报告
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/347702
专题资源环境科学
推荐引用方式
GB/T 7714
. RFF Response to US Department of Energy Notice of Intent and Request for Information Regarding Establishment of a Civil Nuclear Credit Program,2022.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
百度学术
百度学术中相似的文章
必应学术
必应学术中相似的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。