Global S&T Development Trend Analysis Platform of Resources and Environment
Regulators finish design assessment of new nuclear power station | |
admin | |
2022-02-07 | |
发布年 | 2022 |
语种 | 英语 |
国家 | 英国 |
领域 | 资源环境 |
正文(英文) |
News story
Regulators finish design assessment of new nuclear power stationThe Office for Nuclear Regulation and the Environment Agency have confirmed the UKHPR1000 nuclear reactor is suitable for use in the UK. ![]() Regulators complete design assessment of UK HPR1000 new nuclear power station The Office for Nuclear Regulation (ONR) and the Environment Agency have confirmed that the UK Hualong Pressurised Water Reactor (UK HPR1000) is suitable for construction in the UK, subject to the necessary licensing, planning permission and environmental permits, following completion of their in-depth assessment of the nuclear reactor design. The UK HPR1000 is based on the Hualong One power plant, designed by China General Nuclear Group (CGN). The ONR and the Environment Agency, the regulators who carry out the Generic Design Assessment (GDA) of new reactor designs, are satisfied that this reactor meets regulatory expectations on safety, security and environmental protection at this stage of the regulatory process. The regulators assess the acceptability of new nuclear power station designs in a process called Generic Design Assessment. This helps ensure that any new nuclear power stations built in the UK meet high standards of safety, security, environmental protection and waste management. ONR has issued a Design Acceptance Confirmation (DAC) and the Environment Agency has issued a Statement of Design Acceptability (SoDA) to China General Nuclear, EDF and General Nuclear International Ltd, the partners in this GDA of the UK HPR1000. Saffron Price Finnerty, Nuclear Regulation Manager at the Environment Agency, said:
Mark Foy, ONR’s Chief Nuclear Inspector, said:
The assessment reports are available on the regulators’ websites, along with the detail of regulatory decisions and observations throughout the process.
Published 7 February 2022
|
URL | 查看原文 |
来源平台 | UK Environment Agency |
文献类型 | 新闻 |
条目标识符 | http://119.78.100.173/C666/handle/2XK7JSWQ/345595 |
专题 | 资源环境科学 |
推荐引用方式 GB/T 7714 | admin. Regulators finish design assessment of new nuclear power station. 2022. |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
查看访问统计 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
[admin]的文章 |
百度学术 |
百度学术中相似的文章 |
[admin]的文章 |
必应学术 |
必应学术中相似的文章 |
[admin]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论