GSTDTAP  > 资源环境科学
Permit granted for next stage in Hoveton Broad Restoration project
admin
2021-10-14
发布年2021
语种英语
国家英国
领域资源环境
正文(英文)
Press release

Permit granted for next stage in Hoveton Broad Restoration project

The Environment Agency has granted a permit to place fish barriers across the entrances to Hoveton Great Broad as part of a restoration project.

A public consultation took place earlier this year to consider an application by Natural England for a flood risk activity permit. The permit is required to install the permeable fish barriers.

This was followed by a minded to consultation, where the Environment Agency published its intention to grant the permit and asked the public for additional comments.

The Natural England led project aims to restore clear water conditions to Hoveton Great Broad and Hudson’s Bay by using natural restoration techniques.

All consultation responses were reviewed and after careful consideration of all the evidence and views submitted, the Environment Agency decided to grant the permit.

An Environment Agency spokesperson said:

We have looked at all the evidence and views provided and come to the conclusion to grant the permit.

Once the project is finished, fish will be allowed back in the restored broad which will provide better habitat for a wider range of species.

We will continue to work with Natural England and anglers to monitor any impact on the wider broadland fishery including surveying once the barriers are installed.

For the Broad to return to clear water, the amount of algae needs to be reduced. The project proposes to remove the majority of fish from the broad, which will allow water fleas to thrive. They will then feed on the algae, thereby cleaning the water. This is a well-recognised form of lake restoration called biomanipulation.

The barriers will be in place for up to 10 years, preventing the fish from entering the Broad while the ecology recovers.

Background

This is a resubmitted application from Natural England. The original decision in July 2020 was withdrawn due to a procedural issue.

Published 14 October 2021
URL查看原文
来源平台UK Environment Agency
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/339415
专题资源环境科学
推荐引用方式
GB/T 7714
admin. Permit granted for next stage in Hoveton Broad Restoration project. 2021.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。