GSTDTAP  > 资源环境科学
DOI10.17226/26358
Temporary Pavement Markings Placement and Removal Practices in Work Zones
National Academies of Sciences, Engineering, and Medicine
2021-10-01
出版年2021
国家美国
领域资源环境
英文摘要

Agencies must consider many factors, such as work zone duration and weather conditions, in selecting appropriate pavement marking materials to effectively guide drivers through work zones.

The TRB National Cooperative Highway Research Program's NCHRP Synthesis 574: Temporary Pavement Markings Placement and Removal Practices in Work Zones addresses the need for more knowledge on which different types of temporary markings are suitable for specific conditions.

URL查看原文
来源平台National Academies Press
引用统计
文献类型科技报告
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/338511
专题资源环境科学
推荐引用方式
GB/T 7714
National Academies of Sciences, Engineering, and Medicine. Temporary Pavement Markings Placement and Removal Practices in Work Zones,2021.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[National Academies of Sciences, Engineering, and Medicine]的文章
百度学术
百度学术中相似的文章
[National Academies of Sciences, Engineering, and Medicine]的文章
必应学术
必应学术中相似的文章
[National Academies of Sciences, Engineering, and Medicine]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。