GSTDTAP  > 地球科学
Nornickel tests extraction of metals from waste after flooding hit output
admin
2021-09-07
发布年2021
语种英语
国家国际
领域地球科学
正文(英文)
Image: Nornickel

Russian mining giant Nornickel has extracted additional metals from waste products as part of new technology it tested to support its 2021 output from its Arctic mines that were hit by flooding, it said on Tuesday.

The world’s largest producer of palladium and high-grade nickel reduced its 2021 output forecast after two of its mines stopped production for several months this year due to underground flooding. Its profit, however has so far been supported by higher metals prices.

“In the first half of 2021, with ore mining limited … it became necessary to additionally load the production capacity,” Nornickel said in a statement.

The metals – 200 tonnes of nickel, 50 tonnes of copper, 80 kg of platinum group metals, 2 kg of gold, and 44 kg of silver – were extracted last month from low-nickel pyrrhotite product.

It is essentially a waste material left after the main cycle at an ore-processing plant.

“The new technology makes it possible to significantly increase the recovery of metals (from pyrrhotite product),” Nornickel said.

While Nornickel continues to refine the new technical solution, it is unclear how much of such waste products the company has around its long-running industrial assets and what portion of it the miner would be willing to try to extract more metals from.

The first nickel plant near the Arctic city of Norilsk was built in 1930s.

(By Polina Devitt; Editing by Bernadette Baum)

URL查看原文
来源平台Minging.com
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/336758
专题地球科学
推荐引用方式
GB/T 7714
admin. Nornickel tests extraction of metals from waste after flooding hit output. 2021.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。