GSTDTAP  > 地球科学
Vale closes mines after evacuation order at Xingu dam area
admin
2021-06-04
发布年2021
语种英语
国家国际
领域地球科学
正文(英文)
Timbopeba complex. Image from Wikimedia Commons.

Vale has interrupted production at its Timbopeba mine and part of its Alegria mine after prosecutors ordered the evacuation of an area around the nearby Xingu dam, in the state of Minas Gerais.

The closures will reduce its output by 40,000 iron ore tonnes a day, it said. The company stopped traffic on the Fabrica Nova railroad, which usually transports iron ore produced at Usina Timbopeba.

Timbopeba was closed temporarily, reducing production by 33,000 iron ore tonnes a day, the company said.

Vale’s iron ore output totaled 68 million tonnes in 1Q21, 14.2% higher than in 1Q20, but down 5.5% compared to the 72 million tonnes average analyst estimate.

The year-on-year growth was in part attributed to the gradual resumption of halted operations in Timbopeba.

The miner maintains its full-year guidance of between 315-335 million tonnes of iron ore for 2021.

In 2015, a dam operated by Samarco, a joint venture between Vale and BHP Group in the town of Mariana, burst, followed in 2019 by another in the town of Brumadinho which killed almost 300 people.

Vale said there is no “imminent risk” of the Xingu dam bursting.

URL查看原文
来源平台Minging.com
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/329038
专题地球科学
推荐引用方式
GB/T 7714
admin. Vale closes mines after evacuation order at Xingu dam area. 2021.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。