GSTDTAP  > 气候变化
Green Cooling in Public Procurement
admin
2021-05-12
出版年2021
国家德国
领域气候变化
英文摘要

How to advance the procurement of climate-friendly and energy efficient air conditioners in the public sector

Cover

Download full report

The information provided within this study shall serve as a basis for tackling barriers in introducing “Green Public Procurement” as well as updating procurement criteria of room air conditioners in order to reduce cooling related energy consumption and GHG emissions of public buildings.


Main findings:

Green Cooling has a high potential to reduce costs, energy and the climate impact of public buildings. Surveys conducted in multiple countries in the framework of this study show that:

  • Air conditioning in public buildings is often responsible for about 50% of total electricity consumption and single-split ACs alone account for approx. 40% of total installed cooling capacity.
  • Replacing an average split AC installed in a public building within the cooling capacity range up to 7.4 kW with a Green AC of the same cooling capacity, an annual electricity saving of approx. 1,000 kWh on average can be achieved.
  • The electricity saving potential amounts to 28% of the baseline electricity consumption, providing promising framework conditions in terms of energy cost savings for the conversion to Green ACs. Furthermore, with the envisaged annual growth rate of 4.4 % on average, demand is expected to increase.
  • In addition to reducing energy consumption, replacing a conventional AC with a Green AC offers in average an annual GHG emission reduction potential of 1,100 kg CO2eq, which equals to 52% of the baseline emissions.

The survey also assessed typical green public procurement practices, enablers for and barriers preventing green cooling in public buildings. According to the respondents, the following barriers are most dominant:

  • Financial barriers, in particular the high initial investment costs that usually come with more efficient (Green) ACs. Procurement authorities (PA) still evaluate lowest purchase costs together with good product service as the main procurement criteria for ACs, without considering the life cycle costs of ACs. Even though the procurement of Green ACs generates cost savings, reducing costs are often not seen directly as a result of implementing GPP.
  • Political & regulatory barriers, in particular the lack of (political) leadership to adopt more ambitious GPP targets and action plans.
  • Technical barriers, in particular the lack of environmental procurement criteria to promote Green Cooling technologies.
Infographic on Barriers and Enablers of Green Public Procurement
Barriers and Enablers of Green Public Procurement

Contact for further information: Lukas Kahlen, Sybrig Smit

URL查看原文
来源平台NewClimate Institute for Climate Policy and Global Sustainability
文献类型科技报告
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/326860
专题气候变化
推荐引用方式
GB/T 7714
admin. Green Cooling in Public Procurement,2021.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。