Global S&T Development Trend Analysis Platform of Resources and Environment
Samarco expects to reach pre-2015 production by 2029 | |
admin | |
2020-12-30 | |
发布年 | 2020 |
语种 | 英语 |
国家 | 国际 |
领域 | 地球科学 |
正文(英文) | Samarco estimates that only in 2029 it should reach a production scale between 22 million and 24 million tonnes of iron ore per year, the same level as before the failure of the Fundão dam in November 2015. In November 2015, the dam, owned by Samarco, which is controlled by Vale and BHP – burst, releasing 39.2 million cubic meters of tailings waste in the Rio Doce Basin, killing 19 people. It was considered Brazil’s worst environmental disaster. Samarco’s gradual restart of operations incorporates concentrator 3 at the Germano complex and pelletising plant 4 at Ubu, as well as a new system of tailings disposal combining a confined pit and tailings filtering system for dry stacking. The company said it expects initially to produce approximately eight million tonnes of iron ore pellets per year. According to the company, a second concentrator can be restarted in approximately 6 years to reach a production rate of approximately 14-16 million tonnes. Samarco said it is committed to remediate and compensate the victims and that up to September 2020, over $1.9 billion had been allocated as compensation.
|
URL | 查看原文 |
来源平台 | Minging.com |
文献类型 | 新闻 |
条目标识符 | http://119.78.100.173/C666/handle/2XK7JSWQ/309250 |
专题 | 地球科学 |
推荐引用方式 GB/T 7714 | admin. Samarco expects to reach pre-2015 production by 2029. 2020. |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
查看访问统计 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
[admin]的文章 |
百度学术 |
百度学术中相似的文章 |
[admin]的文章 |
必应学术 |
必应学术中相似的文章 |
[admin]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论