GSTDTAP  > 资源环境科学
Sheffield river maintenance works to reduce flood risk
admin
2020-09-01
发布年2020
语种英语
国家英国
领域资源环境
正文(英文)
Press release

Sheffield river maintenance works to reduce flood risk

Gravel and debris are being removed from rivers in Malinbridge and Hillsborough to help reduce the risk of flooding in Sheffield

Showing the gravel that has collected in the river at Hillsborough

Gravel and deposits in the River Loxley at Hillsborough

The Environment Agency will be starting work in the river channel in Sheffield this month (September) to help reduce the risk of flooding in the city.

These works will take place in the River Loxley at Malinbridge and Hillsborough, and on the River Don at Norfolk Bridge.

During high river flows it is important to ensure that bridges and the nearby channel don’t restrict the flow of water. To ensure this, gravel, brick and stone deposits will be reduced from areas where it has built up underneath bridge arches and in the adjacent river.

Overhanging vegetation and trees around bridges will also be removed to ensure the flow of water in the river is not restricted and debris is less likely to get caught.

This project is part of the £32 million programme of recovery works across Yorkshire to repair defences damaged by the flood event last February. Since November officers have inspected over 3,000 flood defence assets along the Rivers Don, Rother and Aire, carried out urgent repairs, and continued work to improve flood defences.

To plan these works, the project team has worked with flood risk, geomorphology and fisheries specialists from the Environment Agency to minimise the impact the reduction of the deposits may have on fish and wildlife in the area. Carrying out the work in September also avoids fish spawning periods and the bird nesting season.

Lianne Grogan, Sheffield catchment advisor for the Environment Agency, said:

These works are important as part of our river maintenance programme to help reduce the risk of flooding. We’ve worked closely with teams to consider flood risk, fish and wildlife, and this approach ensures the works balance the need to improve the flow of water through the river during a flood, whilst also retaining channel gravels for aquatic species and vegetation cover for fish.

We can’t entirely prevent flooding from rivers and streams, but we can reduce the likelihood of flooding by ensuring that rivers, becks and streams are free from excess debris and vegetation that might block the watercourse so that in high rain events water remains in the channel.

Works are planned to start from 7 September and expected to take around a week at each location depending on weather conditions. The Environment Agency has employed contractors AmcoGiffen to carry out the work.

For any enquiries about the work email: SYPSO@environment-agency.gov.uk

Published 1 September 2020
URL查看原文
来源平台UK Environment Agency
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/292408
专题资源环境科学
推荐引用方式
GB/T 7714
admin. Sheffield river maintenance works to reduce flood risk. 2020.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。