GSTDTAP  > 地球科学
Constantine Metal to spend $2.15 million on Palmer project in Alaska
admin
2020-06-25
发布年2020
语种英语
国家国际
领域地球科学
正文(英文)
Palmer project area. (Image courtesy of Constantine Metal Resources).

Constantine Metal Resources (TSXV: CEM) announced that $2.15 million have been approved by the Constantine Mining LLC Joint Venture, of which it owns 51%, for exploration work at the Palmer zinc-copper-gold-silver project in southeast Alaska.

In detail, the company’s summer program includes fieldwork, environmental and project permitting work for future underground exploration development and continued outreach to keep the Haines Borough and the State of Alaska informed on project activities. 

The company’s summer program includes fieldwork, environmental and project permitting work for future underground exploration development

“Most of the fieldwork is planned for mid to late summer to reduce the concerns of covid-19 exposure and transmission with an emphasis on using local Haines employees for as much of the work as possible,” the company said in a media statement. “The new road to the underground exploration portal location provides access to several surface mineral prospects that have seen limited historical work. These include Jasper Mountain, Red Creek massive pyrite +/- sphalerite area, EM 37 Zone (12.0% Zn, 2.7% Pb, 47.6 g/t Ag in a 0.15-meter chip-channel sample) and the source area for the Christmas Creek quartz-sericite-pyrite plus barite float. The prospects will be evaluated for future drill targeting.”

Palmer is a high-grade volcanogenic massive sulphide-sulphate project located in coastal southeast Alaska. Mineralization at Palmer occurs within the same belt of rocks that is host to the Greens Creek mine, one of the world’s richest VMS deposits. 

The project hosts two NI 43-101 compliant resources, the Palmer deposit and AG Zone deposit, with a total consolidated mineral resource of 4.68 million tonnes of 10.2% zinc equivalent in the indicated category and 9.59 million tonnes of 8.9% zinc equivalent in the inferred category. A preliminary economic assessment was completed in June 2019, which presents a low-capex, low-operating cost, high-margin underground mining operation with attractive environmental attributes.

1441 0
URL查看原文
来源平台Minging.com
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/278227
专题地球科学
推荐引用方式
GB/T 7714
admin. Constantine Metal to spend $2.15 million on Palmer project in Alaska. 2020.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。