Global S&T Development Trend Analysis Platform of Resources and Environment
BOEM Announces Plans To Conduct Environmental Review Of Proposed Wind Energy Facility Offshore Massachusetts | |
admin | |
2018-03-29 | |
发布年 | 2018 |
语种 | 英语 |
国家 | 美国 |
领域 | 资源环境 |
正文(英文) | /newsroom/press-releases/boem-announces-plans-conduct-environmental-review-proposed-wind-energy" class="node node--type-news node--news-type node--view-mode-full node--full-view node--is-page"> Sub title Agency seeks comments from the public Release Date 03/29/2018 Washington, DC Contacts: Stephen Boutwell In support of the President's America-First Offshore Energy Strategy, the Bureau of Ocean Energy Management (BOEM) today announced a Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) for the Construction and Operations Plan (COP) submitted by Vineyard Wind LLC that would allow it to construct and operate an 800-megawatt (MW) wind energy facility offshore Massachusetts. The publication of the NOI opens a 30-day public comment period. During this time, BOEM will conduct five public scoping meetings and accept comments. The input received via this process will be used to inform preparation of the EIS. "The offshore wind industry continues to advance at a rapid rate, and the Administration’s commitment to energy security as well as strong state leadership will ensure its success,” said BOEM Acting Director Walter Cruickshank. “BOEM will work with industry, government partners, and other key stakeholders to make sure that any development is done in an environmentally safe and responsible manner. Public input plays an essential role for identifying and mitigating any potential impacts from proposed development activities." BOEM’s scoping process is intended to identify any important issues and potential alternatives for consideration in the Vineyard Wind COP EIS. Throughout the scoping process, there will be multiple opportunities to help BOEM determine significant resources and issues, impact-producing factors, reasonable alternatives, and potential mitigating measures to be analyzed in the EIS. The 30-day public comment period extends through 11:59 p.m. Eastern Time on Monday, April 30. The public scoping meetings will be held as follows: New Bedford, Massachusetts Martha’s Vineyard, Massachusetts Nantucket, Massachusetts Hyannis, Massachusetts Kingston, Rhode Island Highlights from Vineyard Wind’s proposal include the following:
At its nearest point, the project area is approximately 14 miles from the southeast corner of Martha’s Vineyard and a similar distance from the southwest side of Nantucket. Water depths where the turbines would be located range from approximately 37 to 49 meters (approximately 121 to 161 feet). Earlier this year, BOEM took an important step toward making the regulatory process more transparent and flexible by publishing draft guidelines for the use of “Design Envelopes” in Construction and Operations Plans for offshore wind energy facilities in the United States. This is the first COP received this year and the first to utilize this new approach. Detailed information about the proposed wind energy facility, including the COP, can be found on BOEM’s website at: https://www.boem.gov/Vineyard-Wind/. |
URL | 查看原文 |
来源平台 | Bureau of Ocean Energy Management |
文献类型 | 新闻 |
条目标识符 | http://119.78.100.173/C666/handle/2XK7JSWQ/234707 |
专题 | 资源环境科学 |
推荐引用方式 GB/T 7714 | admin. BOEM Announces Plans To Conduct Environmental Review Of Proposed Wind Energy Facility Offshore Massachusetts. 2018. |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
推荐该条目 |
保存到收藏夹 |
查看访问统计 |
导出为Endnote文件 |
谷歌学术 |
谷歌学术中相似的文章 |
[admin]的文章 |
百度学术 |
百度学术中相似的文章 |
[admin]的文章 |
必应学术 |
必应学术中相似的文章 |
[admin]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论