GSTDTAP  > 资源环境科学
Swingbridge reopens ahead of national ride
admin
2020-02-17
发布年2020
语种英语
国家新西兰
领域资源环境
正文(英文)

Introduction

A swingbridge in Pureora Forest has reopened in time for a cycling event which travels the length of New Zealand this month.

Date:  17 February 2020

The 36-metre Arataki Swingbridge across the Mangakino Stream was originally constructed in 1978 by the New Zealand Forest Service. It links cycle trails from Waikato into the popular Pureora Timber Trail.

DOC temporarily closed the bridge in January when staff noticed it was hanging unevenly.

Te Kuiti-based DOC Operations Manager Oscar Emery says with organisers of the non-profit Tour Aotearoa bike-packing event planning to use the bridge for their February ride, an urgent repair to the bridge was needed.

“The Pureora Forest includes some fantastic cycle trails and scenery, and we wanted to ensure the riders in Tour Aotearoa could use the bridge as part of their journey through this part of the country,” Mr Emery says.

Mr Emery says an estimated 200 hours of staff time have gone into assessing, repairing and testing the bridge, which is made from steel mesh and cables.

“The team worked really hard in some hot conditions to excavate footings at the bridge and replace a range of elements fundamental to its structure. We’ve carried out a load test to ensure it is structurally sound, and now it’s ready for Tour Aotearoa riders to enjoy.”

Mr Emery says Tour Aotearoa organisers crowd-sourced more than $10,000 to support DOC to undertake the urgent repair on the bridge.

“To have Tour Aotearoa help us make this happen is a great example of how DOC can partner with its stakeholders to achieve results allowing people to enjoy really fabulous experiences on public conservation land.”

Tour Aotearoa Organiser Jonathan Kennett credited DOC staff for their willingness to get the repair undertaken just a few weeks out from the event.

“DOC did an incredible job and we are so happy the bridge has been repaired so quickly,” he says. “The alternative was a very long detour involving highway riding.”

Tour Aotearoa participants are expected to cross the Arataki Swingbridge later this month, and it is also open to casual riders and walkers.

Cyclists planning to use the bridge may need to remove panniers from their bikes and will need to cross one at a time.

The Arataki Swingbridge can be accessed from Titiraupenga Rd or Arataki and Pakonui Rds.

Tour Aotearoa website

Contact

For media enquiries contact:

Phone: +64 4 496 1911
Email: media@doc.govt.nz

URL查看原文
来源平台Department of Conservation
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/227812
专题资源环境科学
推荐引用方式
GB/T 7714
admin. Swingbridge reopens ahead of national ride. 2020.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。