GSTDTAP  > 地球科学
Lion One encouraged by untested targets at Fijian gold project
admin
2020-02-10
发布年2020
语种英语
国家国际
领域地球科学
正文(英文)
Underground drilling at the Tuvatu gold project. (Image courtesy of Lion One Metals).

Lion One Metals (TSXV: LIO) announced that “a robust structural network” has been revealed at its 100%-owned Tuvatu alkaline gold project in Fiji.

In a press release, the miner said that controlled source audio magnetotelluric or CSAMT surveys conducted in late 2019 clearly show structural controls of known lode systems and reveal numerous new untested targets.

In detail, the studies reveal a deep-rooted, E-dipping structural corridor controls the N-S striking Tuvatu lode system opening up potential for drill expansion of these lodes beyond 1-kilometre depth and helping focus the search for a feeder.

Lion One now has a long list of new structural drill targets that have the potential for hosting gold-bearing lode deposits

The surveys also revealed at least three untested structural corridors identified west of the Tuvatu lode system and two to the east, all similarly deep-rooted like the Tuvatu lode system.

“As hoped, our recent CSAMT results have provided a detailed picture of the underlying structural architecture of the Tuvatu alkaline gold system,” Quinton Hennigh, technical advisor to Lion One, said in the statement.

“We can readily see evidence of structures we think were critical conduits for gold-bearing fluids during time of mineralization. This has generated a multitude of new drill targets. In the vicinity of the Tuvatu deposit, we can discern structures that will allow us to better plan holes in search of feeders at depth, we readily see new structural zones that have yet to be drill tested, we see structural intersections that may have served to localized mineralization, and importantly, we see many new untested structures elsewhere within the Navilawa caldera.”

The high-grade Tuvatu project is the largest undeveloped gold project in Fiji. According to Lion One, it is expected to produce 100,000 ounces of the yellow metal per year over its 10-year mine life. The production target is based on a 600-tonne-per-day CIL operation yielding recoveries of 86% with up to 40% of gold recoverable through the gravity circuit.

1180 0
URL查看原文
来源平台Minging.com
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/226902
专题地球科学
推荐引用方式
GB/T 7714
admin. Lion One encouraged by untested targets at Fijian gold project. 2020.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。