GSTDTAP  > 资源环境科学
Siemens Gamesa to Build Australian Wind Farm with Storage Battery
admin
2018-04-12
发布年2018
语种英语
国家美国
领域资源环境
正文(英文)

The company's contract with the renewable energy company Neoen calls for Siemens Gamesa to build the entire complex and then maintain it for 25 years.

Siemens Gamesa announced April 10 it will build and then operate a pioneering 194 MW wind farm in Australia that will incorporate a battery energy storage system. The company has been awarded an EPC contract for the entire project, which will encompass a wind farm with 56 of the company's turbines and a 20 MW / 34 MWh lithium-ion (Li-ion) battery to be provided by Tesla.

The company's contract with the renewable energy company Neoen calls for Siemens Gamesa to build the entire complex on an engineering, procurement, and construction basis and then maintain it for 25 years. Located in the Australian town of Stawell, in the state of Victoria, the facility is called the Bulgana Green Energy Hub. Construction will begin this month, and the facility is expected to be commissioned by August 2019.

It is the largest single-stage project in Australia for Neoen, which reported the total project cost is about A$350 million.

The complex already has secured two power purchase agreements, one with the government of the state of Victoria for the next 15 years and the other with the Australian agribusiness Nectar Farms, which will use LED light technology to grow tomatoes in greenhouses, for the next 10 years. Nectar Farms also will receive the power stored in the batteries during low wind periods.

URL查看原文
来源平台Environmental Protection
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/113827
专题资源环境科学
推荐引用方式
GB/T 7714
admin. Siemens Gamesa to Build Australian Wind Farm with Storage Battery. 2018.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。