GSTDTAP  > 资源环境科学
Earthmoving contractor working on Motutapu
admin
2018-05-07
发布年2018
语种英语
国家新西兰
领域资源环境
正文(英文)

Introduction

An earthmoving contractor will be working on Motutapu Island for the next four weeks repairing slip damage caused by Cyclone Debbie, just over a year ago.

Date:  07 May 2018

An earthmoving contractor will be working on Motutapu Island for the next four weeks, starting tomorrow (Tuesday 8 May), repairing slip damage caused by Cyclone Debbie, just over a year ago.

Cyclone Debbie hit Motutapu in April last year, bringing heavy rain that triggered 300 slips on the island.

The slips and washouts blocked roads and tracks and shut down key infrastructure on Motutapu.DOC closed the island for six months until the risk of slips had eased, roads and tracks had been cleared and infrastructure restored.    

The contractor is working at three sites on Motutapu, that were worst hit by the Cyclone Debbie slips. The total cost of the work is $211,000. 

The first work site is on a road near Islington Bay, near the causeway that connects Motutapu to Rangitoto island.

The road was blocked by a Cyclone Debbie slip. The contractor is filling a large crack in the hillside above the road to prevent any further slipping.

The second site is on a road leading to the Motutapu Outdoor Education Camp. A slip undermined the road and the contractor is shoring up the road and ensuring it won’t be undermined by slips in future rainstorms.

The third site is at Home Bay campsite where a slip closed the toilet block. The contractor is working on the hill above the toilet block to limit, as much as possible, any potential for further slipping.

The toilet block survived the slip undamaged. The work on the hillside will ensure there’s no risk of it being hit by another slip.

The contract work will cause minimal disruption to people visiting Motutapu.  

The contractor will ensure there is no risk to people visiting Motutapu, or camping at Home Bay, as long as they follow the contractor’s instructions on how to keep themselves safe.

Contact

For media enquiries contact:

Phone: +64 4 496 1911
Email: media@doc.govt.nz

URL查看原文
来源平台Department of Conservation
文献类型新闻
条目标识符http://119.78.100.173/C666/handle/2XK7JSWQ/106556
专题资源环境科学
推荐引用方式
GB/T 7714
admin. Earthmoving contractor working on Motutapu. 2018.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[admin]的文章
百度学术
百度学术中相似的文章
[admin]的文章
必应学术
必应学术中相似的文章
[admin]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。